Mining
With 28 years in the business and 15 years onsite at
Highland Valley Copper, Harrison Industrial
Contractors, Ltd. provides complete electrical
solutions for new and existing mining installations.
We have the experience and resources to handle major
shutdowns under tight timelines with confidence and
efficiency. From problem analysis, design, and project
management through install and maintenance, Harrison
can keep the mine lit and running under the most
demanding conditions.
Harrison at New Gold’s New Afton
Harrison Industrial
is fully capable and trained to work underground. At
New Afton, BC’s newest underground mine, we built and
wired the 138KV substation on the surface, the Gyro
crusher 3 kilometers underground, all the surface and
underground fiber optic, and everything electric
between. As part of the project and in keeping with
our unwavering commitment to safety, our project team
managed the lock-out program for the entire
construction group, including all third-party
contractors. At the peak of the project we had 60
electricians working 24 hours a day, 7 days a week,
and we are proud to be able to say that in all those
hours we had zero lost-time incidents.
In the toughest underground conditions we integrated seamlessly with the other contractors and never missed a deadline. At the end of the project we turned over a complete, turnkey electrical system including a professional QA/QC package.
Highland Valley Copper.
Harrison Industrial has been providing
electrical services for Highland Valley Copper for the
past 18 years and has been called upon to help in the
design, budgetary analysis, and implementation of
complex projects under extremely tight schedules.
Our employees’ deep experience at the Highland Valley site and our adaptable crew size makes our work at Highland Valley both time- and cost-efficient. As safety and efficiency go hand in hand, Harrison Industrial works with the BC mines inspector to ensure that all installations are compliant with the Mines Act, the Electrical Safety Branch, and Worksafe BC. We are committed to a safe work atmosphere regardless of the project’s complexity or its time or budget constraints.
Harrison Industrial has provided Highland Valley with multiple 138KV substation upgrades, SF6 breaker installations, system grounding upgrades, and a main rock crusher move, along with a wide array of smaller upgrades and installations. Most recently, we completed Booster 2 construction, including 138KV substation, 5KV switchgear installation, and lighting and control wiring along with complete commissioning package. We expect to put our experience in building wiring, fibre optic installations and testing, data highway installations and testing, and page-talk installations and testing in the near future
Our project teams and technicians are comfortable managing projects that require wide technical expertise and huge productivity in extremely short downtime windows: our customers can expect us to handle the most demanding assignments with zero compromises in work quality or safety.